Project Development and Design
Selection and coordination of financial and technical resources
Project and Construction Management
Installed machinery and equipment packages
Developing a successful project requires thinking strategically about a few issues. First, it is necessary to
develop the project concept into a pre-feasibility study by confirming the market, research and select the best
available proven technology, and the impact on cost/return opportunities. On the next phase, a more detailed
engineering and implementation methodology study will be developed as the base for a firm cost estimate
and financial return projection. On the final phase, engineering and constructability analysis and project
management tools will be used to ensure the successful completion on target with the established goals. Our
experience and extensive network of partners will ensure on-time on-budget implementation.
Some Recent Projects;
setstats
1
setstats
1
setstats
1
setstats
1
Project - Client
Country
Description
 Ethanol Fuel Plant
USA
2 stage filtration and RO system
Produce Cont washing           
 recycling
USA
4 stage – filters + softener- Hollow Fiber UF and RO systems  in a skid
US  Army
Iraq
EPCM RO system – 2 MGPD_ 6500 m3/d  Tigris River Delta water for
Drinking - Process and Construction engineering included
US  Navy
Italy
Residual Chlorine control system
AEI Energy - Matheu
Argentina
21 m3/h 3 stage system / Gas Turbine injection – modular SKID 3 stage  
Softener + RO + chem system assembly. Construction engineering incld
AEI Energy - Parana
Argentina
16  m3/h Gas Turbine injection – modular SKIDS - 2 stage
AEI Energy - Concepcion
Argentina
16  m3/h Gas Turbine injection – modular SKIDS - 2 stage
AEI Energy - Olavarria
Argentina
16  m3/h Gas Turbine injection – modular SKIDS - 2 stage
AEI Energy - Bragado
Argentina
16  m3/h Gas Turbine injection – modular SKIDS - 2 stage
AEI Energy - BelleVille
Argentina
 9  m3/h  Gas Turbine injection – modular SKIDS - 2 stage
Sateri  Rayon
Brasil
2 Stage Ultra filtration + RO – Caustic  recovery
Siemens Energy
USA
2 Stage Ultrafiltration + RO – Electrolytic + Machine shop effluent recovery
Holland America Cruises
USA
5 star resort-EPCM  500 m3/d well water Green Sand + RO + chem. skids
 Termocolon
Panama
Chem SKIDS +Condensate  system/160 MW  GE 2x7B Combined Cycle
Cogen
Ritz-Carlton
Cayman
Islands
Laundry recovery – Flocculation Clarifier+ Nano Filtration  &  Polymer. prep
Energia del Sur / Patagonia   
 Energy
Argentina
EPCM 10  m3/h / 160 MW Combined Cycle – modular SKIDS - 4 stage
Softener + RO + EDI system+ Chemical injection skids & condensate sys